You're on Secoda: Keep Every Answer True, With Data Workers Doing the Operations Work

Already on Secoda? It is where your team searches, documents and asks questions about data. Data Workers does the operations work that keeps the answers true, behind approvals.

Your team runs on Secoda. Every Snowflake table, dbt model and Metabase question is searchable, with column lineage, an owner and a description. The glossary says what "completed session" and "active tutor" mean. People open a Question instead of pinging the data channel, and the best answer gets a green check and lands in search. Monitors watch row counts, freshness and custom SQL, and their incidents show what sits downstream. Secoda AI answers in plain language, runs SQL against the warehouse and turns a good prompt into a scheduled agent. Its MCP server hands the same catalog, lineage and glossary to Claude and Cursor. Since December 2025, Secoda has been part of Atlassian, with Atlassian saying Secoda's expertise will strengthen Rovo and Secoda telling customers their experience will not change.

Secoda is where your team searches, documents and asks questions about data. Data Workers does the operations work that keeps the answers true, behind approvals. An answer in Secoda is only as good as the table under it. When a new value slips past a dbt filter at 3 a.m., someone has to find it, change the model, rerun the flow and prove the number before money moves.

Key takeaways

  • •Secoda keeps its job. Catalog, glossary, Questions, Monitors, Secoda AI and the MCP server stay as they are.
  • •Secoda's signals start the work. A monitor incident, its downstream resources and the owner reach Data Context Wizard over Secoda's API and MCP server and become an incident with a traced cause.
  • •The fix lands where the cause lives. Data Workers proposes the dbt diff, queues the rerun through your orchestrator and verifies the result, with a named owner approving first.
  • •Answers stay current. Data Workers drafts the glossary update and the answer to the open Question; the owner posts them in Secoda.
  • •Start with a pilot. One domain where Secoda Monitors already run, read-only first.

Secoda is the answer desk. Data Workers is the control plane behind it.

Secoda holds what your data is, what it means and what people have asked about it. Data Workers holds what happens when the answer stops matching the data: one context across the systems Secoda describes, one approval flow and one audit trail, with Spellbook Data Catalog (in preview) as the place your team reviews it.

A Thursday at a Series B online tutoring marketplace, two days before tutors are paid. The stack: a PostgreSQL bookings app, dlt pipelines run in Prefect, Snowflake, dbt Core in Prefect, Secoda as the catalog and Metabase for the finance dashboards. This is an illustrative example.

TimeSystemWhat happens
Wed 17:30PostgreSQLAn app release lets a session end early. Those bookings now get the status completed_partial, with the time actually taught in billable_minutes
02:10dlt in PrefectThe nightly flow loads bookings into Snowflake. No column changed, so nothing schema-aware has anything to flag
03:00dbt Core in Snowflakefct_tutor_earnings still keeps status = 'completed'. 1,870 partial sessions drop out, and the week's earnings read $412,600 instead of about $448,900
06:00SecodaThe Row Count monitor on fct_tutor_earnings falls below its learned threshold. Secoda opens an incident, lists the downstream payout export and Metabase dashboard, and posts to the data alerts channel in Slack
08:40SecodaTwo tutors tell support that sessions are missing. The support lead opens a Question; an automation assigns it to the data team. Secoda AI answers from the glossary, which still defines a completed session as status = 'completed'
08:45Data WorkersThe on-call's assistant reads the incident, the lineage and the glossary term over Secoda's MCP server and hands them to Data Workers, which links the Question and opens one incident
09:00Data WorkersIt compares status values in the raw table with last week's, finds completed_partial first arriving in the 02:10 load, and lists the blast radius: the payout export, the Metabase "Tutor payouts" dashboard and a tutor quality model
09:10Data WorkersIt proposes a dbt diff that counts partial sessions at their billable time, adds an accepted-values test on status so the next new value fails the build, and declares a Secoda monitor, with its owner, in the model's YAML. It drafts a new glossary definition and an answer for the Question
10:05SpellbookThe analytics engineer listed as owner in Secoda reviews the cause, diff and blast radius, approves and merges. dbt CI passes
10:20PrefectData Workers queues the week's rebuild of fct_tutor_earnings and the payout export through Prefect
10:45SnowflakeData Workers re-runs its checks on the earnings table, confirms the total is back on its monitor_metrics baseline, and the finance owner confirms it against billable time; Data Workers writes the receipt
11:00SecodaThe owner posts the drafted answer with the receipt link and marks it as the answer; the steward updates the glossary term. The monitor is back in range
Fri 08:00MetabaseFinance signs off $448,900 in tutor payouts from the corrected dashboard
Incident timeline across the stack: what Secoda, your team and Data Workers each do, step by step

Secoda did its part: the monitor caught the drop, the incident showed the payout export downstream, and the Question reached the right team. The cause sat in an app release and a dbt filter, two places Secoda describes and doesn't change. Without the trace, about 600 tutors would have been underpaid by $36,300 on Friday, and Secoda AI would have kept quoting a definition the business no longer used.

JobWhat Secoda doesWhat Data Workers does
The recordHolds the model, its owner, description, lineage and the glossary termBrings them in as sourced context and checks the dbt logic against them
The signalRuns the Row Count monitor, opens the incident, alerts SlackPicks up the incident with the owner and downstream resources attached
The questionRoutes the Question to the data team and answers from the glossaryLinks the Question to the incident and drafts the corrected answer
The causeLeaves the cause for a person to findTraces it across PostgreSQL, the dlt load and dbt to the new status value
The fixShows the change once the model is rebuiltProposes the dbt diff with its blast radius, routes it to a named owner, queues the rerun after approval
The proofBrings the monitor back in range after the rebuildRe-runs the checks on the rebuilt earnings table, leaves the bookings comparison to its owner and keeps a receipt with cause, diff, approver and rollback path

Why doesn't Secoda just do this itself?

Secoda is built to be the one trusted place a lean data team points everyone to, and it draws its write lines with that in mind. Its MCP server searches, retrieves entities, walks lineage, reads the glossary and runs SQL, and "all operations respect your existing data governance and access controls"; no tool in it edits a dbt model or a pipeline. Secoda AI's documented scope leaves out live monitor changes, access requests and audit logs. Its agents are saved prompts that run on a schedule, and the docs say plainly that they are read-only. When Secoda touches code, it does so carefully: the GitHub extension comments on dbt pull requests, and the metadata sync opens a pull request for a person to review. That design is right for an answer desk: it keeps Secoda neutral and its security review simple.

Fixing the tutor payouts is a different promise: changing a dbt model Secoda catalogs but doesn't own, scoping what it touches, getting the right approval, rerunning the flow, proving the total and owning the rollback. That needs blast radius across systems, approvals per domain and receipts for changes in tools Secoda doesn't run. That product is Data Workers.

Every tool owns a slice. Data Workers covers the whole lifecycle

Secoda owns one slice outright: the answer desk for data, where search, documentation, lineage and Questions meet. Each point tool adds another console, contract and handoff. Data Workers covers the whole lifecycle with one context, one approval flow and one audit trail, and builds on the catalog you already run.

Spider chart of ten jobs a data team does: Data Workers covers the whole list, Secoda goes deep on its own area
StageData WorkersSecodaWhy we scored it this way
Catalog & Context99.5Secoda's home stage: search, catalog, column lineage, documentation, glossary and Questions in one workspace, served to AI over its MCP server. Data Workers reads it as a first-class source.
Analytics & Insights87Secoda AI searches, runs SQL on connected sources, charts the result and runs saved prompts on a schedule as agents. Data Workers answers across platforms from approved definitions and fixes what the answer exposes.
Data Quality86Monitors cover row count, freshness, nulls, uniqueness, ranges and custom SQL, plus a Quality score. Data Workers also repairs the cause and re-checks.
Observability & Incidents8.55.5Monitor incidents show downstream resources, alert Slack or email and open a Jira ticket. Data Workers traces the cause across systems, proposes the fix behind approval and verifies it.
Pipelines & Ingestion8.52Secoda catalogs pipelines and watches job error rates; running them is outside its job. Data Workers proposes pipeline changes and queues reruns through your orchestrator after approval.
Schema & Migration84The GitHub extension comments on dbt pull requests that delete catalogued entities. Data Workers detects schema changes upstream and generates migrations with rollback SQL for the owner.
Governance & Access8.58Policies, RBAC and access requests (Enterprise plan, beta) that provision on approval and revoke at expiry in Snowflake, BigQuery, Redshift and Postgres. Data Workers dry-runs each proposed grant against inheritance, sensitive columns and policy first.
Security & Privacy85Tags, policies and permission-aware AI and MCP access protect the catalog. Data Workers flags new sensitive column names in pull request review and proposes the masking for the owner to apply.
Cost / FinOps84Snowflake cost, credit and query-volume monitors, and Secoda AI flags slow queries. Data Workers attributes Snowflake credits to the dbt model behind them and drafts the fix for its owner.
MLOps & Models7.52Machine learning models sit outside Secoda's scope. Data Workers keeps the data under the models healthy.

How Secoda and Data Workers work together

People keep working where they work: Claude Code or Cursor for SQL and dbt, Secoda for search and Questions, Metabase for dashboards. Spellbook is where the data team reviews each change with its incident, blast radius, approver and rollback path; approval requests reach the approver in Slack or email. Underneath, Data Context Wizard keeps one governed context graph, the Data-Agents Swarm (20+ specialist agents) does the work, and the Autonomous Data-Conductor runs each fix: detect, diagnose, fix, review, verify, remember.

How Data Workers fits with Secoda: your coding agent on top, Data Workers in the middle, your estate underneath

What comes in from Secoda. Data Workers connects to Secoda over its API and MCP server today. Monitor incidents and measurements come from Secoda's Monitors API; lineage, entities and glossary terms come over the MCP tools entity_lineage, retrieve_entity and glossary. Each fact arrives with its source and the time it was seen, and stays yours. Context Wizard joins them to what Secoda's lineage points to but doesn't hold (Snowflake query history, Prefect flow runs, dbt manifests and test results) through Data Workers' native Snowflake, PostgreSQL, dbt and Prefect connectors; dlt and Metabase connect over their APIs today. Your agent can then call explain_table for definition, lineage and trust score, blast_radius_analysis for what a change touches, get_quality_score for quality and get_incident_history for open incidents.

Setup over MCP today. Your Secoda admin enables MCP and creates an API token for a service user scoped to the pilot domain; Secoda documents setup through the open-source secoda/secoda-mcp server run with that token. For Data Workers, clone the open-source repository and add start-agent.sh entries, as the client setup docs show.

// Example: .mcp.json for Claude Code
{
  "mcpServers": {
    "secoda": {
      "command": "python",
      "args": ["/path/to/secoda-mcp/server.py"],
      "env": {
        "API_TOKEN": "${SECODA_API_TOKEN}",
        "API_URL": "https://app.secoda.co/api/v1/"
      }
    },
    "dw-context-catalog": {
      "command": "/path/to/dataworkers-claw-community/start-agent.sh",
      "args": ["dw-context-catalog"]
    },
    "dw-quality": {
      "command": "/path/to/dataworkers-claw-community/start-agent.sh",
      "args": ["dw-quality"]
    },
    "dw-incidents": {
      "command": "/path/to/dataworkers-claw-community/start-agent.sh",
      "args": ["dw-incidents"]
    }
  }
}

EU, APAC and self-hosted workspaces swap in their own API host. List the tools with /mcp. Secoda's run_sql queries through Secoda's own warehouse connection, so keep that service user's role narrow, or have the admin turn SQL off for AI. Then "why are partial sessions missing from tutor earnings?" gets the owner, glossary term and lineage from Secoda, lineage beyond the catalog from trace_cross_platform_lineage, the cause from get_root_cause and the table's state from run_quality_check, in one answer.

Where writes go. Data Workers proposes the dbt change as a diff for the owner to merge, including the Secoda monitor declared in the model's YAML, which Secoda picks up on its next dbt sync. It queues reruns through Prefect after approval. Catalog updates (a glossary definition, an answer, a clearer description) are drafted for the owner, who posts them in Secoda; Secoda's metadata sync can carry descriptions back into dbt as a pull request. Approved facts land in the Context Wizard graph. Secoda stays the system of record for its metadata, by design.

One request, L0 to L4. The autonomy ladder is set per domain.

The autonomy ladder: L0 manual, L1 observe, L2 propose, L3 act reversibly, L4 autonomous
  • •L0 manual. Connected, not acting.
  • •L1 observe. Each monitor incident arrives explained with cause, owner and blast radius; nothing changes, and the log records what each action would have needed.
  • •L2 propose. Data Workers drafts the dbt diff, rerun plan, glossary update and answer; a named owner approves in Spellbook first.
  • •L3 act reversibly. For proven classes, such as rebuilding a week of a model after an approved upstream fix, Data Workers acts, verifies and keeps the undo path.
  • •L4 autonomous. For a scoped, trusted class, it fixes, verifies and posts the receipt on its own.

An unanswered approval request expires and escalates; it never auto-grants. No agent can promote its own work, and an org-wide stop halts all autonomous dispatch. The safety model is in is it safe to let AI agents change production data, sign-off in how approvals work for AI data agents and the levels in autonomy levels L0 to L4 explained. The agents run in your infrastructure and hold your warehouse credentials and model key; your data stays in your systems, and the hosted Conductor sees workflow metadata only (where does our data go).

The same pattern runs on Atlan and DataHub, and, on the Atlassian side, Jira. The category answer is in how Data Workers is different from a data catalog, connectors in Data Workers integrations, and the wider view in the AI data catalog and agentic data catalog notes.

What changes for your team

Six jobs that run on autopilot with Data Workers next to Secoda, with a concrete example of each

Secoda teams tend to be small: the same three people answer Questions, chase incidents and fix dbt models. With Data Workers on top, those jobs run on autopilot at the level you set.

  • •Incidents. A Secoda Monitor incident arrives traced to its cause, with the owner and a proposed fix attached.
  • •Data quality. New values and broken filters get a test and a fix, confirmed when the monitor is back in range.
  • •Cloud spend. Snowflake credits are tied to the dbt model behind them, with the fix drafted for its owner.
  • •Access. Each proposed grant gets a dry run of effective privileges, sensitive columns and policy conflicts before the approver decides, alongside Secoda's own access requests.
  • •Audits. Every change carries the incident, the owner who approved it, the diff and a rollback path.
  • •Migrations. Schema moves are planned in approved waves, with rollback SQL for the owner to apply.

The team gets its week back, and the answers in Secoda keep matching the numbers.

Keep Secoda, or consolidate?

Keep Secoda if you love it; Data Workers works with it from day one. Many teams consolidate once Data Workers runs that slice too.

For most Secoda teams the answer is to keep it: your glossary, Questions history and documentation live there, and your people go there first. Atlassian ownership doesn't change that, and your team's assistant uses Secoda's documented API and MCP server side by side with Data Workers either way. What teams consolidate is the tooling around it: the script that turns monitor incidents into tickets, the rerun runbook, the spreadsheet that maps glossary terms to dbt models, a separate observability console. Teams that later want one agentic catalog can move to Spellbook without a cutover weekend, because Data Workers has read Secoda from the start. Weighing building this layer yourself on Secoda's MCP server? Read build it ourselves with Claude Code and MCP servers: the connection is the easy part; cross-system context, approvals and rollback are the work.

The case for your CFO

The outcome: the catalog the company already pays for starts paying back in correct numbers. Breaks Secoda detects get fixed at the source the same morning, so the answers people read in Secoda, and the money that moves on them, stay right. Above, that is the difference between paying tutors $448,900 and underpaying about 600 of them by $36,300.

The risk story: Data Workers reads Secoda with one scoped service token. Every change shows its blast radius, goes to a named owner, lands through your existing dbt and Prefect workflows, is verified and leaves a receipt: trigger, diff, before and after checks, approver and undo path. Autonomy is set per domain from L0 manual to L4 autonomous. Zero migration: Secoda, Snowflake, dbt and Prefect stay where they are.

Why now: Secoda already hands your context to AI agents over MCP, and agents across the stack are starting to change things; a record of who approved what is cheaper to build before that queue grows. The first win is one domain where every monitor incident arrives explained and owned. What stays the same: your glossary, Questions, documentation, roles and review process. For the numbers, see the ROI of agentic data operations. Start with a pilot (pricing); the pilot is credited in full against the first year.

The sentence to repeat upstairs: "Secoda is where our people get answers about our data; Data Workers keeps those answers true, with the owner approving every fix and a receipt for each one."

Getting started

Start with a pilot. Pick one domain where Secoda Monitors already run, such as payouts, put Secoda's MCP server in your team's client with a scoped token, and let Data Workers explain every monitor incident the on-call brings it before you turn on the first fix class. Plans are on the pricing page, and the pilot is credited in full against the first year.

FAQ

Secoda is part of Atlassian now. Does that change how Data Workers connects? No. Atlassian acquired Secoda in December 2025. Secoda told customers their experience would not change while parts of its infrastructure move to Atlassian's Cloud Platform. Data Workers connects through Secoda's documented API and MCP server, and works with Jira too.

Does Data Workers write to Secoda? Catalog changes are drafted for the owner: Data Workers writes the glossary update, description or answer, and the owner posts it in Secoda. Your team's assistant only needs Secoda's read tools; Data Workers' agents never call them.

How is this different from Secoda AI agents? Secoda agents run a saved Secoda AI prompt on a schedule and report the results, such as stale tables or slow queries; they are read-only by design. Data Workers acts on the systems underneath: it traces the cause, proposes the change, gets it approved, runs it and verifies it.

Can Secoda Monitors and Data Workers checks run side by side? Yes. Keep your Secoda Monitors as the signal, including monitors declared as code in dbt YAML. Data Workers reads their incidents, adds its own checks where a fix needs proof, and can propose new Secoda monitors in the same dbt change.

What about Secoda access requests? Keep using them. Where a grant is proposed through Data Workers, it dry-runs it first (effective privileges after role inheritance, sensitive columns reached, policy conflicts, an expiry recommendation) and proposes the grant for the platform owner to apply.

What does Data Workers store? Metadata and scrubbed facts (definitions, lineage, owners, incident history, receipts) in your infrastructure, not copies of your tables. The hosted Conductor sees workflow metadata only.

Sources

  • •Secoda, homepage (tagline; Atlassian banner), https://www.secoda.co/ (checked Oct 3, 2026)
  • •Secoda, Atlassian acquires Secoda (updated Dec 4, 2025; Atlassian EVP Tiffany To on Rovo; customer commitments), https://www.secoda.co/blog/atlassian-acquires-secoda (checked Oct 3, 2026)
  • •Secoda docs, MCP server (eight tools; setup), https://docs.secoda.co/features/ai-assistant/secoda-mcp-server (checked Oct 3, 2026)
  • •Secoda docs, Secoda AI capabilities, https://docs.secoda.co/features/ai-assistant/secoda-ai-capabilities (checked Oct 3, 2026)
  • •Secoda docs, Agents, https://docs.secoda.co/features/ai-assistant/secoda-ai-agents (checked Oct 3, 2026)
  • •Secoda docs, Monitors, https://docs.secoda.co/features/monitoring (checked Oct 3, 2026)
  • •Secoda docs, Questions, https://docs.secoda.co/features/ask-questions-in-secoda (checked Oct 3, 2026)
  • •Secoda docs, Access requests, https://docs.secoda.co/features/access-requests (checked Oct 3, 2026)
  • •Secoda docs, GitHub extension, https://docs.secoda.co/extensions/github (checked Oct 3, 2026)
  • •Secoda API reference, Monitors and Questions, https://docs.secoda.co/api/reference/monitors and https://docs.secoda.co/api/reference/questions (checked Oct 3, 2026)
  • •Secoda MCP repository (MIT), https://github.com/secoda/secoda-mcp (checked Oct 3, 2026)
  • •Data Workers, Client setup (open-source docs), https://dataworkers.io/opensource-docs/client-setup/ (checked Oct 3, 2026)
  • •Data Workers open-source repository, https://github.com/DataWorkersProject/dataworkers-claw-community (checked Oct 3, 2026)